HomePsychology and Education: A Multidisciplinary Journalvol. 7 no. 10 (2023)

VALIDATION AND DETERMINATION OF LEVEL OF SOCIAL ACCEPTABILITY OF HYDROELECTRIC POWER PLANT PROJECT OF HEDCOR INC. IN LA TRINIDAD, BENGUET

Bobby Atayan

Discipline: Education

 

Abstract:

The main factor in the success of a particular hydroelectric power plant industry is its social acceptance from the host communities like the Indigenous Cultural Communities/Indigenous Peoples, landowners, barangay, municipal, and the province. However, to be socially acceptable in the conduct of getting the social license to operate, these host communities shall be satisfied. The study determined the level of social acceptability and satisfaction by the ICCs/IPs, Host Communities, and Local Government Units (LGUs) to the hydroelectric power plant project of Hedcor, Inc. in La Trinidad, Benguet. Based on the findings, the level of social acceptance of La Trinidad ICCs/IPs, landowners and host communities (Barangay, Municipal, and Province) to Hedcor Hydro Project is very high acceptance when values and interest, engagement and participation, trust and confidence, information, and contextual are met and that the community will renew for another contract and give their consent for a new hydro project of Hedcor because of very high acceptance. Thus, the satisfaction of the Host Communities is very important in acquiring the consent of the Host Communities and the benefits to be shared from the power plant. Moreover, it is essential that the benefits taken from the project by the community are of equal value for the utilization of Hedcor to the natural resources of the host community.



References:

  1. Anongos, A. (2001). Pitfalls and Pipelines: IP and Extractive Industries.
  2. Dandeneau, S. (2002). Indicator’s Relevant for Indigenous Peoples.
  3. Department of Sociology and Anthropology, (2012). All About Dams and People’s Movement Opposing Them.
  4. Doyle, C. (2014). Indigenous Peoples and Extractive Sector: Towards a Rights-respecting Engagement.
  5. Drucker, C. (2001). Dam the Chico: Hydropower Development and Tribal Resistance.
  6. Galapia, W. (1995). Comparative Assessment of the Efficiency and Performance of the Bagui Windmills and the Aqua Grande MiniHydroelectric Power Plant as Producers of Renewable Energy in Ilocos Norte.
  7. Hackenbeng, B. (2005). On the Road to Development: Impact of Infrastructure on the Changing Economic Lives of Women in Southeast Mindanao.
  8. Pana, P. (1993). Support System of Ambuklao Observation Tunnel Ambuklao Hydroelectric Power Plant,Bokod, Benguet.
  9. Patrices, A. (1998). Free, Prior and Informed Consent in Reply.
  10. Ramos, P. (1997). Social Conditions in the Mining Industry. The Case of Benguet Corporation.
  11. Ronquillo, G. (1998). Dam-Induced Displacement and Resettlement: The Social Impacts of the San Roque Multi-Purpose Project on the Displaced Families in Itogon, Benguet.
  12. Santos, T. (2000). The Role of Mining in National Development:
  13. The Case of Benguet Province. Sarfati, G. (1998). The Dam and the Women of Dalupirip.
  14. Swiderska, Krystyna, (2000). Participatory and Culture: Exploring Community Protocols, Rights and Consent.