1. Albatal, A. (2013). Effect of inadequate site investigation on the cost and time of a construction project. Taylor & Francis. https://doi.org/10.1201/b16058-49
2. Al-Hazim, N., Salem, Z. A., & Ahmad, H. (2017). Delay and cost overrun in infrastructure projects in Jordan. Procedia Engineering, 182, 324–331. https://doi.org/10.1016/j.proeng.2017.03.105
3. Aljohani, A., Ahiaga-Dagbui, D., & Moore, D. (2017). Construction projects cost over-run: What does the literature tell us? International Journal of Innovation, Management and Technology, 8(2), 71–77. https://doi.org/10.18178/ijimt.2017.8.2.71
4. Arain, F. M., Assaf, S. A., & Pheng, L. S. (2000). Causes of discrepancies between design and construction. Architectural Science Review, 47(3), 237–249. https://doi.org/10.1080/00038628.2000.9697530
5. Aslan Noor. (2021). Corruption in the acquisition of land for the benefit of infrastructure development in Indonesia. International Journal of Cyber Criminology, 15(2). DOI: 10.5281/zenodo.4766545
6. Azis, A., Memon, A., Rahman, I., & Karim, A. (2013). Controlling cost overrun factors in construction projects in Malaysia. Research Journal of Applied Science, Engineering and Technology, 5(22), 4706–4714. http://dx.doi.org/10.19026/rjaset.5.4706
7. Bascon, R., Gangcuangco, R., & Carreon, A. (2023). Investigation on the factors influencing time and cost overrun in vertical construction in Pampanga. ResearchGate. https://doi.org/1704711
8. Cabahug, R., Arquita, M., De La Torre, S. M., Valledor, M., & Olivares, S. (2018). Factors influencing the delay of road construction projects in Northern Mindanao, Philippines. Mindanao Journal of Science and Technology. https://mjst.ustp.edu.ph/index.php/mjst/article/view/15
9. Famadico, J., & Baccay, A. (2019). Comparative study on change orders in building projects. In Global Civil Engineering Conference 2017: Malaysia (Vol. 9, Lecture Notes on Civil Engineering). https://www.researchgate.net/publication/320707875_Comparative_Study_on_Change_Orders_in_Building_Projects
10. Gomez, A. (2022). A review of the knowledge base for the communication skills of educational administrators. International Journal of Multidisciplinary: Applied Business and Education Research, 3(5), 748–757. Global Academics Interdisciplinary Research and Development.
11. Hanif, H., Khurshid, M. B., Lindhard, S. M., & Aslam, Z. (2016). Impact of variation orders on time and cost in mega hydropower projects of Pakistan. Journal of Civil Engineering and Construction, 21(2), 3–12. https://doi.org/10.21315/jcdc2016.21.2.3
12. Hanna, A., Camlic, R., Peterson, P., & Lee, M. (2004). Cumulative effect of project changes for electrical and mechanical construction. Journal of Construction Engineering and Management, 130(6), 873–880.
13. Muhammad Ali Musarat, Wesam & Salah Alaloul, M.S. Liew. (2021). Impact of inflation rate on construction projects budget: A review. Ain Shams Engineering Journal, 12(1). https://doi.org/10.1016/j.asej.2020.04.009
14. Quiniquini, A. R. (2017). An assessment of the approved variation orders in DPWH-implemented projects. De La Salle University Animo Repository. https://animorepository.dlsu.edu.ph/etd_masteral/5738
15. Rocha, P., Ferreira, N., Pimenta, F., & Pereira, P. (2023). Impacts of prefabrication in the building construction industry. Encyclopedia, 3, 100003. https://doi.org/10.3390/encyclopedia3010003
16. Schuldt, S., Nicholson, M., Adams II, Y., & Delorit, J. (2021). Weather-related construction delays in a changing climate: A systematic state of the art review. Sustainability, 13(5). https://doi.org/10.3390/su13052861
17. Seidu, R., Allen, M., Ruoyu, J., Chen, Y., Young, B., & Ebohon, O. (2022). Construction infrastructure project cost overrun and cost control/management techniques. ResearchGate. https://www.researchgate.net/publication/364185195
18. Susanti, R. (2020). Cost overrun and time delay of construction projects in Indonesia. Journal of Physics: Conference Series, 1444, 012050. https://doi.org/10.1088/1742-6596/1444/1/012050
19. Taber, K. S. (2017). The use of the Cronbach alpha when developing and reporting research instruments in science education. Research in Science Education, 47(6), 1349–1367. https://doi.org/10.1007/s11165-016-9602-2
20. Vaardini, U., Karthiyayini, S., & Ezhilmathi, P. (2016). Study on cost overrun in construction projects – A review. ResearchGate. https://www.researchgate.net/publication/303459769
21. Westerveld, E. (2003). The project excellence model: Linking success criteria and critical success factors. International Journal of Project Management, 21(6), 417–424. https://doi.org/10.1016/S0263-7863(02)00139-0